Have you ever dreamed of someone welcomes you with a red carpet treatment every day. If yes then your dream will now come true for the rest of your lives once you have your home at Park Titanium in Wakad, Pune. This is a residential project that is planned to be constructed as 3 Towers of Stilt + 12 Floors each which comprises of 3BHK & 4BHK Luxurious Condominiums. Whatever you need for a special and luxurious treatment is now available here, Be it a fully equipped clubhouse, party hall, indoor games or a putting green at your doorstep. This property has each and everything in and around the project boundaries. The kind of construction materials used ensures that you are equally contributing towards the eco friendly nature.
Having said all this, you will still be connected to all the major landmarks and locations out here. Not only this but also the current expected price is expected to be increased very soon due to the maximum number of queries received till date. So hurry up, call us now and grab your dream home before the price goes high.
Specification:
Structure: * Earthquake resistant RCC structure, with floor-to-floor height of 3.05 mtr.
either backing plaster or POP over it, or gypsum finish. * White acrylic primer with putty for walls and ceilings. Externally, the entire building shall be finished in fully acrylic paint.
Windows: * UPVC/powder coated or anodised aluminium/equivalent sliding windows and sliding doors with mosquito net provision. * No grills will be provided or permitted from outside. * Grills may be fitted by each apartment holder from inside
Doors: * All external/internal doors/frames will be designer doors with S.S. finished mortise locks of Dorset/equivalent make. All doors with magnetic door catchers. Main doors will have lock with card and key facility. The key card provided will open the doors to all common facilities such as lobbies, club, etc.
Flooring: * 900mm x 900mm vitrified tiles in lobby, living, bedrooms and passage areas except Master bedroom which will have wooden flooring. * Anti skid/rustic/matt tiles in kitchen, bathrooms, terraces and balconies.
Electrification: * Three-phase electrical supply to all apartments with concealed distribution board and MCB’s/ELCB’s/Isolators. * Concealed copper internal wiring with
* Legrand Mosaic/equivalent plate type switches. Sufficient light/plug/power points.
Air-conditioning: * Provision in all bedrooms and living room for air-conditioners. * Electrical provision and provision for fixing outdoor units for split AC along with required cores in beams/walls to facilitate fixing of split air-conditioners without any damage to walls/paint/etc.
DTH Television/ Telephone/ Broadband Connection: * One telephone connection with intercom facility within the complex and one broadband connection with each apartment. * Each apartment will have one DTH Television connection. * The above installations/connections are free. * All recurring/monthly/usage charges for the telephone/intercom/DTH connection/ Broadband will have to be paid for by the user. * There will be provision for extra TV/telephone connections in all bedrooms.
Kitchen: * Furnished modular kitchen with granite platform on two sides with cabinets below and above the platform with stainless steel sink. * Rustic/ matt finished flooring tiles along with suitable wall tiles. * Metered piped gas in kitchen.
Bathrooms: 1) Concealed internal plumbing for water supply. All bathrooms with hot/cold water supply for shower and washbasin areas. 2) Designer tiles on all walls, KOHLER / equivalent make sanitary ware to be provided with platforms (wherever possible) for the washbasins. 3) Hot/Cold mixers, taps, etc. of KOHLER /equivalent make and all shower areas with glass shower partitions/cubicles. 4) False ceiling in all bathrooms.
Railing: All balconies with S.S and glass railing.
Specification:
Security/Entrance lobbies: * Intercom system for controlled entry in the complex. Secure, enclosed entrance lobbies to all buildings with reception and waiting area for visitors.
Car Parking: * 150% car parking facility in 2-tiered parking plus ample visitor parking.
Generator: * All common areas/facilities such as elevators/club house/ pumps with fully automatic generator back up.
LPG: * LPG reticulated system in the kitchen.
Garbage Disposal: * Garbage chute will be provided with facility for separate disposal of dry and wet garbage.
Fire Fighting: * Fire fighting facilities/provision as required by law. Fire extinguisher in lobbies on all floors.
Rain Water Harvesting: * Rainwater harvesting/ storage/ recharging underground water system to effectively harness rainwater.
Sewage Treatment: * Sewage treatment plant for entire project with ability to reuse the recycled water for landscaping, flushing, etc.
Elevators: * Each apartment building with two automatic high speed elevators, of which one will be a stretcher elevator. * All elevators come with an in-built safety mechanism that will bring down the elevator to the nearest floor in case of power failure.
Landscaping: * Ample landscaped /open areas with water bodies, walking/jogging tracks, play areas for children, relaxation spaces, and party areas.
Club House: * Earmarked spaces for table tennis, pool / billiards, cards, etc. * Encompasses a well-equipped air conditioned gymnasium, multipurpose hall, full sized swimming pool and children’s play pool.